↓ Skip to Main Content
Bedford Boats Builder of Quality Naples Sabots
  • Home
  • About our Sabot
    • Options
      • Gelcoat Colors
      • Gresham Marine
    • Results
  • DB Marine Snipe
  • Boat Blog
  • Photo Gallery
    • Modifying the Mold
    • Preparing Fibreglass and Foam Core
    • Vacuum Bag Preparations
    • Boat 1 in mold
    • Boat 1 Measurement
    • Launching Boat #1
  • Sitemap
  • Contact Us
Home › Sabot Building Updates › Boat 2 and Mold Modifications

Boat 2 and Mold Modifications

DonPosted on September 18, 2013 Posted in Sabot Building Updates

Sabot #2 is out of the mold. We have modified the mid-thwart mold and have laid-up the next boat’s mid & bow thwarts. Now looking at making mold modifications for the hull to fair the skeg – this could take a while!

‹ Vacuum Bagging and Infusion
More mold mods ›
©2021 Bedford Boats
| Powered by Responsive Theme